Employee Portal
Customer Portal
About Us
Contact Us
Corporate
Stanley Elevator
Home
New Sales
Products
Passenger Elevators
Freight Elevators
Machine Room Less Elevators (MRL)
Specialty Equipment
Design Planning
Leed
Support Services
Helpful Information
Code Resource
Service
Area Served
Maintenance
Dispatch
Contract Types
Parts Inventory
Repair
Minor Upgrades
Catastrophic Events
Pre-Maintenance
State Test Repairs
Security Systems
Testing
New Hampshire
Maine
Rhode Island
Massachusetts
Modernization
Modernization
Cabs
Controls
Mechanical
Jacks/Cylinders
Product Application Matrix
Fixtures
Doors
Support Service
Designing and Planning Support Services
Drawing submittal packages available for approval including:
Pit sketches to get the project out of the ground prior to the approval process
Detailed CAD Elevator layouts specific to your project (in PDF)
Entrance details (in PDF, if applicable)
Signal Fixture layouts (in PDF, if applicable)
Cab drawings (in PDF, if applicable)
Additional informative data
Work by others list to help define the responsibilities of others for a successful installation and state test
Electrical data for fuse and disconnect switch sizing (Link )
Code excerpts covering commonly missed requirements (Link )
Hoistway Ventilation details with recommended manufacturer (Link)
Smoke detector schematics to insure and code compliance
Work in progress punch list to help make the installation ready to successfully pass the State test ( Link to question sheet )
Rail bracket mounting details to integrate with your hoistway construction
Additional miscellaneous details offering a variety of information; pit ladder, fire rated wall assemblies, volume table, etc.
Current manufacturer’s color charts (link to the manufacturer’s website)
Field Coordination Service
Our experienced construction personnel are always available to facilitate that the progress of your elevator project is headed in the right direction with respect to work by other subcontractors.
Storage and Delivery Benefits
Clean and Dry storage facilities to maintain the safe condition of your material until needed on the job
Our fleet of delivery vehicles and forklifts guarantee timely delivery of the elevator material to your site when needed so that the elevator material does not get damaged or inhibit the progress of other areas of your project.
Order Department
Our order department ensures the most accurate material and dependable ship dates so that all equipment is delivered according to your project schedule.